From Low of 4448.5 of 22nd Jan, 08 to
Top of 5506.6 of 5th Feb, 08 – 10 days (21 days Top to Top)
From Top of 5506.6 of 5th Feb, 08 to
Low of 4468.55 of 18th Mar, 08 - 29 days (40 days Low to Low)
From Low of 4468.55 of 18th Mar, 08 to
Top of 4970.8 of 28th Mar, 08 – 6 days (36 days Top to Top)
From Top of 4970.8 of 28th Mar, 08 to
Low of 4628.8 of 7th Apr, 08 – 7 days (13 days Low to Low)
From Low of 4628.8 of 7th April,08 to
Top of 5083.5 of 23rd Apr, 08 - 11 days (17 days Top to Top)
From Top of 5083.5 of 23rd Apr,08 to
Low of 4991.35 of 24th Apr,08 - 1 day (12 days Low to Low)
From Low of 4991.35 of 24th Apr,08 to
Top of 5298.85 of 02nd May,08 - 6 days (7 days Top to Top)
From Top of 5298.85 of 02nd May,08 to
Low of 4913.8 of 12th May,08 - 6 days (12 days Low to Low)
From Low of 4913.8 of 12th May,08 to
Top of 5167.40 of 16th May,08 - 4 days (11 days Top to Top)
From Top of 5167.4 of 16th May,08 to
Low of 4801.9 of 29th May,08 - 8 days (12 days Low to Low)
From Low of 4801.9 of 29th May,08 to
Top of 4908.85 of 30th May,08 - 1 day (09 days Top to Top)
From Top of 4908.85 of 30th May,08 to
Low of 4536.25 of 5th June,08 - 4 days (05 days Low to Low)
From Low of 4536.25 of 5th June,08 to
Top of 4746.3 of 6th June, 08 – 1 day (05 days Top to Top)
From Top of 4746.3 of 6th June,08 to
Low of 4369.8 of 10th June,08 - 2 days (03 days Low to Low)
From Low of 4369.8 of 10th June,08 to
Top of 4679.75 of 18th June,08 – 06 days (09days Top to Top)
From Top of 4679.75 of 18th June,08 to
Low of 4093.2 of 25th June,08 - 5 days (11days Low to Low)
From Low of 4093.2 of 25th June,08 to
Top of 4324.75 of 26th June,08 – 1 day (06 days Top to Top)
From Top of 4324.75 of 26th June, 08 to
Low of 3848.25 of 2nd July, 08 – 4 days (05 days Low to Low)
From Low of 3848.25 of 2nd July, 08 to
Top of 4114.5 of 7th July, 08 – 3 days (07 days Top to Top)
From Top of 4114.5 of 7th July, 08 to
Low of 3896.05 of 8th July, 08 – 1 day (04 days Low to Low)
From Low of 3896.05 of 8th July, 08 to
Top of 4215.5 of 11th July, 08 – 03 days (04 days Top to Top)
From Top of 4215.5 of 11th July, 08 to
Low of 3790.2 of 16th July, 08 – 03 days (06days Low to Low)
From Low of 3790.2 of 16th July, 08 to
Top of 4539.45 of 24th July, 08 – 06 days (09 days Top to Top)
From Top of 4539.45 of 24th July, 08 to
Low of 4159.15 of 29th July, 08 – 03 days (09days Low to Low)
From Low of 4159.15 of 29th July, 08 to
Top of 4615.90 of 6th Aug, 08 – 06 days (09 days Top to Top)
From Top of 4615.90 of 6th Aug, 08 to
Low of 4464 of 8th Aug, 08 – 02 days (08 days Low to Low )
From Low of 4464 of 8th Aug, 08 to
Top of 4649.85 of 12th Aug, 08 – 02 days (04 days Top to Top)
From Top of 4649.85 of 12th Aug, 08 to
Low of 4316.55 of 19th Aug, 08 – 04 days (06 days Low to Low)
From Low of 4316.55 of 19th Aug, 08 to
Top of 4434.9 of 20th Aug, 08 – 01 day (05 days Top to Top)
From Top of 4434.9 of 20th Aug, 08 to
ongoing Low of 4248 of 22nd Aug, 08 – 02 days (ongoing)

TIME FRAME TO WATCH: 25th, 29th & 30th Aug, 08

Indain Stock Market Analysis

Thursday, August 21, 2008

TIME BASED TECHNICALS

From Low of 4448.5 of 22nd Jan, 08 to
Top of 5506.6 of 5th Feb, 08 – 10 days (21 days Top to Top)
From Top of 5506.6 of 5th Feb, 08 to
Low of 4468.55 of 18th Mar, 08 - 29 days (40 days Low to Low)
From Low of 4468.55 of 18th Mar, 08 to
Top of 4970.8 of 28th Mar, 08 – 6 days (36 days Top to Top)
From Top of 4970.8 of 28th Mar, 08 to
Low of 4628.8 of 7th Apr, 08 – 7 days (13 days Low to Low)
From Low of 4628.8 of 7th April,08 to
Top of 5083.5 of 23rd Apr, 08 - 11 days (17 days Top to Top)
From Top of 5083.5 of 23rd Apr,08 to
Low of 4991.35 of 24th Apr,08 - 1 day (12 days Low to Low)
From Low of 4991.35 of 24th Apr,08 to
Top of 5298.85 of 02nd May,08 - 6 days (7 days Top to Top)
From Top of 5298.85 of 02nd May,08 to
Low of 4913.8 of 12th May,08 - 6 days (12 days Low to Low)
From Low of 4913.8 of 12th May,08 to
Top of 5167.40 of 16th May,08 - 4 days (11 days Top to Top)
From Top of 5167.4 of 16th May,08 to
Low of 4801.9 of 29th May,08 - 8 days (12 days Low to Low)
From Low of 4801.9 of 29th May,08 to
Top of 4908.85 of 30th May,08 - 1 day (09 days Top to Top)
From Top of 4908.85 of 30th May,08 to
Low of 4536.25 of 5th June,08 - 4 days (05 days Low to Low)
From Low of 4536.25 of 5th June,08 to
Top of 4746.3 of 6th June, 08 – 1 day (05 days Top to Top)
From Top of 4746.3 of 6th June,08 to
Low of 4369.8 of 10th June,08 - 2 days (03 days Low to Low)
From Low of 4369.8 of 10th June,08 to
Top of 4679.75 of 18th June,08 – 06 days (09days Top to Top)
From Top of 4679.75 of 18th June,08 to
Low of 4093.2 of 25th June,08 - 5 days (11days Low to Low)
From Low of 4093.2 of 25th June,08 to
Top of 4324.75 of 26th June,08 – 1 day (06 days Top to Top)
From Top of 4324.75 of 26th June, 08 to
Low of 3848.25 of 2nd July, 08 – 4 days (05 days Low to Low)
From Low of 3848.25 of 2nd July, 08 to
Top of 4114.5 of 7th July, 08 – 3 days (07 days Top to Top)
From Top of 4114.5 of 7th July, 08 to
Low of 3896.05 of 8th July, 08 – 1 day (04 days Low to Low)
From Low of 3896.05 of 8th July, 08 to
Top of 4215.5 of 11th July, 08 – 03 days (04 days Top to Top)
From Top of 4215.5 of 11th July, 08 to
Low of 3790.2 of 16th July, 08 – 03 days (06days Low to Low)
From Low of 3790.2 of 16th July, 08 to
Top of 4539.45 of 24th July, 08 – 06 days (09 days Top to Top)
From Top of 4539.45 of 24th July, 08 to
Low of 4159.15 of 29th July, 08 – 03 days (09days Low to Low)
From Low of 4159.15 of 29th July, 08 to
Top of 4615.90 of 6th Aug, 08 – 06 days (09 days Top to Top)
From Top of 4615.90 of 6th Aug, 08 to
Low of 4464 of 8th Aug, 08 – 02 days (08 days Low to Low )
From Low of 4464 of 8th Aug, 08 to
Top of 4649.85 of 12th Aug, 08 – 02 days (04 days Top to Top)
From Top of 4649.85 of 12th Aug, 08 to
Low of 4316.55 of 19th Aug, 08 – 04 days (06 days Low to Low)
From Low of 4316.55 of 19th Aug, 08 to
Top of 4434.9 of 20th Aug, 08 – 01 day (05 days Top to Top)
From Top of 4434.9 of 20th Aug, 08 to
ongoing Low of 4271.3 of 21st Aug, 08 – 01 day (ongoing)

Indain Stock Market Analysis

Wednesday, August 20, 2008

TIME BASED TECHNICALS

From Low of 4448.5 of 22nd Jan, 08 to
Top of 5506.6 of 5th Feb, 08 – 10 days (21 days Top to Top)
From Top of 5506.6 of 5th Feb, 08 to
Low of 4468.55 of 18th Mar, 08 - 29 days (40 days Low to Low)
From Low of 4468.55 of 18th Mar, 08 to
Top of 4970.8 of 28th Mar, 08 – 6 days (36 days Top to Top)
From Top of 4970.8 of 28th Mar, 08 to
Low of 4628.8 of 7th Apr, 08 – 7 days (13 days Low to Low)
From Low of 4628.8 of 7th April,08 to
Top of 5083.5 of 23rd Apr, 08 - 11 days (17 days Top to Top)
From Top of 5083.5 of 23rd Apr,08 to
Low of 4991.35 of 24th Apr,08 - 1 day (12 days Low to Low)
From Low of 4991.35 of 24th Apr,08 to
Top of 5298.85 of 02nd May,08 - 6 days (7 days Top to Top)
From Top of 5298.85 of 02nd May,08 to
Low of 4913.8 of 12th May,08 - 6 days (12 days Low to Low)
From Low of 4913.8 of 12th May,08 to
Top of 5167.40 of 16th May,08 - 4 days (11 days Top to Top)
From Top of 5167.4 of 16th May,08 to
Low of 4801.9 of 29th May,08 - 8 days (12 days Low to Low)
From Low of 4801.9 of 29th May,08 to
Top of 4908.85 of 30th May,08 - 1 day (09 days Top to Top)
From Top of 4908.85 of 30th May,08 to
Low of 4536.25 of 5th June,08 - 4 days (05 days Low to Low)
From Low of 4536.25 of 5th June,08 to
Top of 4746.3 of 6th June, 08 – 1 day (05 days Top to Top)
From Top of 4746.3 of 6th June,08 to
Low of 4369.8 of 10th June,08 - 2 days (03 days Low to Low)
From Low of 4369.8 of 10th June,08 to
Top of 4679.75 of 18th June,08 – 06 days (09days Top to Top)
From Top of 4679.75 of 18th June,08 to
Low of 4093.2 of 25th June,08 - 5 days (11days Low to Low)
From Low of 4093.2 of 25th June,08 to
Top of 4324.75 of 26th June,08 – 1 day (06 days Top to Top)
From Top of 4324.75 of 26th June, 08 to
Low of 3848.25 of 2nd July, 08 – 4 days (05 days Low to Low)
From Low of 3848.25 of 2nd July, 08 to
Top of 4114.5 of 7th July, 08 – 3 days (07 days Top to Top)
From Top of 4114.5 of 7th July, 08 to
Low of 3896.05 of 8th July, 08 – 1 day (04 days Low to Low)
From Low of 3896.05 of 8th July, 08 to
Top of 4215.5 of 11th July, 08 – 03 days (04 days Top to Top)
From Top of 4215.5 of 11th July, 08 to
Low of 3790.2 of 16th July, 08 – 03 days (06days Low to Low)
From Low of 3790.2 of 16th July, 08 to
Top of 4539.45 of 24th July, 08 – 06 days (09 days Top to Top)
From Top of 4539.45 of 24th July, 08 to
Low of 4159.15 of 29th July, 08 – 03 days (09days Low to Low)
From Low of 4159.15 of 29th July, 08 to
Top of 4615.90 of 6th Aug, 08 – 06 days (09 days Top to Top)
From Top of 4615.90 of 6th Aug, 08 to
Low of 4464 of 8th Aug, 08 – 02 days (08 days Low to Low )
From Low of 4464 of 8th Aug, 08 to
Top of 4649.85 of 12th Aug, 08 – 02 days (04 days Top to Top)
From Top of 4649.85 of 12th Aug, 08 to
Low of 4316.55 of 19th Aug, 08 – 04 days (06 days Low to Low)
From Low of 4316.55 of 19th Aug, 08 to
ongoing Top of 4434.9 of 20th Aug, 08 – 01 day (ongoing)

TIME FRAME TO WATCH: 19th & 20th Aug, 08
- 19th end of current down & 20th continuation of up movement. Time Frame once again proves right.

Tuesday, August 19, 2008

TIME BASED TECHNICALS

From Low of 4448.5 of 22nd Jan, 08 to
Top of 5506.6 of 5th Feb, 08 – 10 days (21 days Top to Top)
From Top of 5506.6 of 5th Feb, 08 to
Low of 4468.55 of 18th Mar, 08 - 29 days (40 days Low to Low)
From Low of 4468.55 of 18th Mar, 08 to
Top of 4970.8 of 28th Mar, 08 – 6 days (36 days Top to Top)
From Top of 4970.8 of 28th Mar, 08 to
Low of 4628.8 of 7th Apr, 08 – 7 days (13 days Low to Low)
From Low of 4628.8 of 7th April,08 to
Top of 5083.5 of 23rd Apr, 08 - 11 days (17 days Top to Top)
From Top of 5083.5 of 23rd Apr,08 to
Low of 4991.35 of 24th Apr,08 - 1 day (12 days Low to Low)
From Low of 4991.35 of 24th Apr,08 to
Top of 5298.85 of 02nd May,08 - 6 days (7 days Top to Top)
From Top of 5298.85 of 02nd May,08 to
Low of 4913.8 of 12th May,08 - 6 days (12 days Low to Low)
From Low of 4913.8 of 12th May,08 to
Top of 5167.40 of 16th May,08 - 4 days (11 days Top to Top)
From Top of 5167.4 of 16th May,08 to
Low of 4801.9 of 29th May,08 - 8 days (12 days Low to Low)
From Low of 4801.9 of 29th May,08 to
Top of 4908.85 of 30th May,08 - 1 day (09 days Top to Top)
From Top of 4908.85 of 30th May,08 to
Low of 4536.25 of 5th June,08 - 4 days (05 days Low to Low)
From Low of 4536.25 of 5th June,08 to
Top of 4746.3 of 6th June, 08 – 1 day (05 days Top to Top)
From Top of 4746.3 of 6th June,08 to
Low of 4369.8 of 10th June,08 - 2 days (03 days Low to Low)
From Low of 4369.8 of 10th June,08 to
Top of 4679.75 of 18th June,08 – 06 days (09days Top to Top)
From Top of 4679.75 of 18th June,08 to
Low of 4093.2 of 25th June,08 - 5 days (11days Low to Low)
From Low of 4093.2 of 25th June,08 to
Top of 4324.75 of 26th June,08 – 1 day (06 days Top to Top)
From Top of 4324.75 of 26th June, 08 to
Low of 3848.25 of 2nd July, 08 – 4 days (05 days Low to Low)
From Low of 3848.25 of 2nd July, 08 to
Top of 4114.5 of 7th July, 08 – 3 days (07 days Top to Top)
From Top of 4114.5 of 7th July, 08 to
Low of 3896.05 of 8th July, 08 – 1 day (04 days Low to Low)
From Low of 3896.05 of 8th July, 08 to
Top of 4215.5 of 11th July, 08 – 03 days (04 days Top to Top)
From Top of 4215.5 of 11th July, 08 to
Low of 3790.2 of 16th July, 08 – 03 days (06days Low to Low)
From Low of 3790.2 of 16th July, 08 to
Top of 4539.45 of 24th July, 08 – 06 days (09 days Top to Top)
From Top of 4539.45 of 24th July, 08 to
Low of 4159.15 of 29th July, 08 – 03 days (09days Low to Low)
From Low of 4159.15 of 29th July, 08 to
Top of 4615.90 of 6th Aug, 08 – 06 days (09 days Top to Top)
From Top of 4615.90 of 6th Aug, 08 to
Low of 4464 of 8th Aug, 08 – 02 days (08 days Low to Low )
From Low of 4464 of 8th Aug, 08 to
Top of 4649.85 of 12th Aug, 08 – 02 days (04 days Top to Top)
From Top of 4649.85 of 12th Aug, 08 to
ongoing Low of 4316.55 of 19th Aug, 08 – 04 days (ongoing)

TIME FRAME TO WATCH: 19th & 20th Aug, 08

Monday, August 18, 2008

TIME BASED TECHNICALS

From Low of 4448.5 of 22nd Jan, 08 to
Top of 5506.6 of 5th Feb, 08 – 10 days (21 days Top to Top)
From Top of 5506.6 of 5th Feb, 08 to
Low of 4468.55 of 18th Mar, 08 - 29 days (40 days Low to Low)
From Low of 4468.55 of 18th Mar, 08 to
Top of 4970.8 of 28th Mar, 08 – 6 days (36 days Top to Top)
From Top of 4970.8 of 28th Mar, 08 to
Low of 4628.8 of 7th Apr, 08 – 7 days (13 days Low to Low)
From Low of 4628.8 of 7th April,08 to
Top of 5083.5 of 23rd Apr, 08 - 11 days (17 days Top to Top)
From Top of 5083.5 of 23rd Apr,08 to
Low of 4991.35 of 24th Apr,08 - 1 day (12 days Low to Low)
From Low of 4991.35 of 24th Apr,08 to
Top of 5298.85 of 02nd May,08 - 6 days (7 days Top to Top)
From Top of 5298.85 of 02nd May,08 to
Low of 4913.8 of 12th May,08 - 6 days (12 days Low to Low)
From Low of 4913.8 of 12th May,08 to
Top of 5167.40 of 16th May,08 - 4 days (11 days Top to Top)
From Top of 5167.4 of 16th May,08 to
Low of 4801.9 of 29th May,08 - 8 days (12 days Low to Low)
From Low of 4801.9 of 29th May,08 to
Top of 4908.85 of 30th May,08 - 1 day (09 days Top to Top)
From Top of 4908.85 of 30th May,08 to
Low of 4536.25 of 5th June,08 - 4 days (05 days Low to Low)
From Low of 4536.25 of 5th June,08 to
Top of 4746.3 of 6th June, 08 – 1 day (05 days Top to Top)
From Top of 4746.3 of 6th June,08 to
Low of 4369.8 of 10th June,08 - 2 days (03 days Low to Low)
From Low of 4369.8 of 10th June,08 to
Top of 4679.75 of 18th June,08 – 06 days (09days Top to Top)
From Top of 4679.75 of 18th June,08 to
Low of 4093.2 of 25th June,08 - 5 days (11days Low to Low)
From Low of 4093.2 of 25th June,08 to
Top of 4324.75 of 26th June,08 – 1 day (06 days Top to Top)
From Top of 4324.75 of 26th June, 08 to
Low of 3848.25 of 2nd July, 08 – 4 days (05 days Low to Low)
From Low of 3848.25 of 2nd July, 08 to
Top of 4114.5 of 7th July, 08 – 3 days (07 days Top to Top)
From Top of 4114.5 of 7th July, 08 to
Low of 3896.05 of 8th July, 08 – 1 day (04 days Low to Low)
From Low of 3896.05 of 8th July, 08 to
Top of 4215.5 of 11th July, 08 – 03 days (04 days Top to Top)
From Top of 4215.5 of 11th July, 08 to
Low of 3790.2 of 16th July, 08 – 03 days (06days Low to Low)
From Low of 3790.2 of 16th July, 08 to
Top of 4539.45 of 24th July, 08 – 06 days (09 days Top to Top)
From Top of 4539.45 of 24th July, 08 to
Low of 4159.15 of 29th July, 08 – 03 days (09days Low to Low)
From Low of 4159.15 of 29th July, 08 to
Top of 4615.90 of 6th Aug, 08 – 06 days (09 days Top to Top)
From Top of 4615.90 of 6th Aug, 08 to
Low of 4464 of 8th Aug, 08 – 02 days (08 days Low to Low )
From Low of 4464 of 8th Aug, 08 to
Top of 4649.85 of 12th Aug, 08 – 02 days (04 days Top to Top)
From Top of 4649.85 of 12th Aug, 08 to
ongoing Low of 4379.85 of 18th Aug, 08 – 03 days (ongoing)

TIME FRAME TO WATCH: 19th & 20th Aug, 08

Wednesday, August 13, 2008

TIME BASED TECHNICALS

From Low of 4448.5 of 22nd Jan, 08 to
Top of 5506.6 of 5th Feb, 08 – 10 days (21 days Top to Top)
From Top of 5506.6 of 5th Feb, 08 to
Low of 4468.55 of 18th Mar, 08 - 29 days (40 days Low to Low)
From Low of 4468.55 of 18th Mar, 08 to
Top of 4970.8 of 28th Mar, 08 – 6 days (36 days Top to Top)
From Top of 4970.8 of 28th Mar, 08 to
Low of 4628.8 of 7th Apr, 08 – 7 days (13 days Low to Low)
From Low of 4628.8 of 7th April,08 to
Top of 5083.5 of 23rd Apr, 08 - 11 days (17 days Top to Top)
From Top of 5083.5 of 23rd Apr,08 to
Low of 4991.35 of 24th Apr,08 - 1 day (12 days Low to Low)
From Low of 4991.35 of 24th Apr,08 to
Top of 5298.85 of 02nd May,08 - 6 days (7 days Top to Top)
From Top of 5298.85 of 02nd May,08 to
Low of 4913.8 of 12th May,08 - 6 days (12 days Low to Low)
From Low of 4913.8 of 12th May,08 to
Top of 5167.40 of 16th May,08 - 4 days (11 days Top to Top)
From Top of 5167.4 of 16th May,08 to
Low of 4801.9 of 29th May,08 - 8 days (12 days Low to Low)
From Low of 4801.9 of 29th May,08 to
Top of 4908.85 of 30th May,08 - 1 day (09 days Top to Top)
From Top of 4908.85 of 30th May,08 to
Low of 4536.25 of 5th June,08 - 4 days (05 days Low to Low)
From Low of 4536.25 of 5th June,08 to
Top of 4746.3 of 6th June, 08 – 1 day (05 days Top to Top)
From Top of 4746.3 of 6th June,08 to
Low of 4369.8 of 10th June,08 - 2 days (03 days Low to Low)
From Low of 4369.8 of 10th June,08 to
Top of 4679.75 of 18th June,08 – 06 days (09days Top to Top)
From Top of 4679.75 of 18th June,08 to
Low of 4093.2 of 25th June,08 - 5 days (11days Low to Low)
From Low of 4093.2 of 25th June,08 to
Top of 4324.75 of 26th June,08 – 1 day (06 days Top to Top)
From Top of 4324.75 of 26th June, 08 to
Low of 3848.25 of 2nd July, 08 – 4 days (05 days Low to Low)
From Low of 3848.25 of 2nd July, 08 to
Top of 4114.5 of 7th July, 08 – 3 days (07 days Top to Top)
From Top of 4114.5 of 7th July, 08 to
Low of 3896.05 of 8th July, 08 – 1 day (04 days Low to Low)
From Low of 3896.05 of 8th July, 08 to
Top of 4215.5 of 11th July, 08 – 03 days (04 days Top to Top)
From Top of 4215.5 of 11th July, 08 to
Low of 3790.2 of 16th July, 08 – 03 days (06days Low to Low)
From Low of 3790.2 of 16th July, 08 to
Top of 4539.45 of 24th July, 08 – 06 days (09 days Top to Top)
From Top of 4539.45 of 24th July, 08 to
Low of 4159.15 of 29th July, 08 – 03 days (09days Low to Low)
From Low of 4159.15 of 29th July, 08 to
Top of 4615.90 of 6th Aug, 08 – 06 days (09 days Top to Top)
From Top of 4615.90 of 6th Aug, 08 to
Low of 4464 of 8th Aug, 08 – 02 days (08 days Low to Low )
From Low of 4464 of 8th Aug, 08 to
Top of 4649.85 of 12th Aug, 08 – 02 days (04 days Top to Top)
From Top of 4649.85 of 12th Aug, 08 to
ongoing Low of 4497.25 of 13th Aug, 08 – 01 day (ongoing)

Tuesday, August 12, 2008

TIME BASED TECHNICALS

From Low of 4448.5 of 22nd Jan, 08 to
Top of 5506.6 of 5th Feb, 08 – 10 days (21 days Top to Top)
From Top of 5506.6 of 5th Feb, 08 to
Low of 4468.55 of 18th Mar, 08 - 29 days (40 days Low to Low)
From Low of 4468.55 of 18th Mar, 08 to
Top of 4970.8 of 28th Mar, 08 – 6 days (36 days Top to Top)
From Top of 4970.8 of 28th Mar, 08 to
Low of 4628.8 of 7th Apr, 08 – 7 days (13 days Low to Low)
From Low of 4628.8 of 7th April,08 to
Top of 5083.5 of 23rd Apr, 08 - 11 days (17 days Top to Top)
From Top of 5083.5 of 23rd Apr,08 to
Low of 4991.35 of 24th Apr,08 - 1 day (12 days Low to Low)
From Low of 4991.35 of 24th Apr,08 to
Top of 5298.85 of 02nd May,08 - 6 days (7 days Top to Top)
From Top of 5298.85 of 02nd May,08 to
Low of 4913.8 of 12th May,08 - 6 days (12 days Low to Low)
From Low of 4913.8 of 12th May,08 to
Top of 5167.40 of 16th May,08 - 4 days (11 days Top to Top)
From Top of 5167.4 of 16th May,08 to
Low of 4801.9 of 29th May,08 - 8 days (12 days Low to Low)
From Low of 4801.9 of 29th May,08 to
Top of 4908.85 of 30th May,08 - 1 day (09 days Top to Top)
From Top of 4908.85 of 30th May,08 to
Low of 4536.25 of 5th June,08 - 4 days (05 days Low to Low)
From Low of 4536.25 of 5th June,08 to
Top of 4746.3 of 6th June, 08 – 1 day (05 days Top to Top)
From Top of 4746.3 of 6th June,08 to
Low of 4369.8 of 10th June,08 - 2 days (03 days Low to Low)
From Low of 4369.8 of 10th June,08 to
Top of 4679.75 of 18th June,08 – 06 days (09days Top to Top)
From Top of 4679.75 of 18th June,08 to
Low of 4093.2 of 25th June,08 - 5 days (11days Low to Low)
From Low of 4093.2 of 25th June,08 to
Top of 4324.75 of 26th June,08 – 1 day (06 days Top to Top)
From Top of 4324.75 of 26th June, 08 to
Low of 3848.25 of 2nd July, 08 – 4 days (05 days Low to Low)
From Low of 3848.25 of 2nd July, 08 to
Top of 4114.5 of 7th July, 08 – 3 days (07 days Top to Top)
From Top of 4114.5 of 7th July, 08 to
Low of 3896.05 of 8th July, 08 – 1 day (04 days Low to Low)
From Low of 3896.05 of 8th July, 08 to
Top of 4215.5 of 11th July, 08 – 03 days (04 days Top to Top)
From Top of 4215.5 of 11th July, 08 to
Low of 3790.2 of 16th July, 08 – 03 days (06days Low to Low)
From Low of 3790.2 of 16th July, 08 to
Top of 4539.45 of 24th July, 08 – 06 days (09 days Top to Top)
From Top of 4539.45 of 24th July, 08 to
Low of 4159.15 of 29th July, 08 – 03 days (09days Low to Low)
From Low of 4159.15 of 29th July, 08 to
Top of 4615.90 of 6th Aug, 08 – 06 days (09 days Top to Top)
From Top of 4615.90 of 6th Aug, 08 to
Low of 4464 of 8th Aug, 08 – 02 days (08 days Low to Low )
From Low of 4464 of 8th Aug, 08 to
ongoing Top of 4649.85 of 12th Aug, 08 – 02 days (ongoing)